US Bridges

EB Ir 275 over Weil Road

Good

Hamilton County, Ohio · 1.1 MI E of US 22 · Structure no. 3113507

Built
1970
55 years old
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
150 ft
3 main spans
Daily traffic
47,892
2018 count
Owner
State
State Highway Agency

About this bridge

EB Ir 275 over Weil Road is a steel continuous stringer/multi-beam or girder carrying EB Ir 275 over Weil Road in Hamilton County, Ohio. It was built in 1970, so it is 55 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 47,892 vehicles a day, roughly 6% of them trucks, projected to reach 66,474 by 2038. The structure is 150 ft (45.8 m) long and 75 ft wide.

CarriesEB Ir 275
CrossesWeil Road
Location1.1 MI E of US 22
RouteInterstate 275
StateOhio
Coordinates39.25227, -84.32138
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating92.2 US tons
Inventory rating71.1 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length150 ft (45.8 m)
Longest span57 ft (17.4 m)
Deck width75 ft (22.9 m)
Roadway width72 ft (21.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic47,892 (2018)
Projected traffic66,474 by 2038
Trucks6%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was EB Ir 275 over Weil Road built?

It was built in 1970, making it 55 years old in 2025.

What condition is EB Ir 275 over Weil Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does EB Ir 275 over Weil Road carry?

About 47,892 vehicles per day (2018 count), of which roughly 6% are trucks.

How long is EB Ir 275 over Weil Road?

The structure is 150 ft (45.8 m) long with a longest span of 57 ft (17.4 m) and a deck 75 ft wide.

Who owns EB Ir 275 over Weil Road?

It is owned by the State Highway Agency.