Rp NBIR75-WBIR275 over Rmp;n I75 to W I275
GoodHamilton County, Ohio · .2 MI N of Ir 275 · Structure no. 3111199
- Built
- 1960
- 65 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 375 ft
- 6 main spans
- Daily traffic
- 136,770
- 2009 count
- Owner
- State
- State Highway Agency
About this bridge
Rp NBIR75-WBIR275 over Rmp;n I75 to W I275 is a steel continuous stringer/multi-beam or girder carrying Rp NBIR75-WBIR275 over Rmp;n I75 to W I275 in Hamilton County, Ohio. It was built in 1960, so it is 65 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 136,770 vehicles a day, roughly 16% of them trucks, projected to reach 189,837 by 2029. The structure is 375 ft (114.3 m) long and 44 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Rp NBIR75-WBIR275 over Rmp;n I75 to W I275 built?
It was built in 1960, making it 65 years old in 2025.
What condition is Rp NBIR75-WBIR275 over Rmp;n I75 to W I275 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does Rp NBIR75-WBIR275 over Rmp;n I75 to W I275 carry?
About 136,770 vehicles per day (2009 count), of which roughly 16% are trucks.
How long is Rp NBIR75-WBIR275 over Rmp;n I75 to W I275?
The structure is 375 ft (114.3 m) long with a longest span of 72 ft (21.8 m) and a deck 44 ft wide.
Who owns Rp NBIR75-WBIR275 over Rmp;n I75 to W I275?
It is owned by the State Highway Agency.