US Bridges

Ir 75 over Over Clifton Avenue

Good

Hamilton County, Ohio · 1.7 MI N of Ir 74 · Structure no. 3109887

Built
2013
12 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
209 ft
3 main spans
Daily traffic
129,511
2015 count
Owner
State
State Highway Agency

About this bridge

Ir 75 over Over Clifton Avenue is a prestressed concrete continuous stringer/multi-beam or girder carrying Ir 75 over Over Clifton Avenue in Hamilton County, Ohio. It was built in 2013, so it is 12 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 129,511 vehicles a day, roughly 16% of them trucks, projected to reach 179,761 by 2035. The structure is 209 ft (63.7 m) long and 166 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIr 75
CrossesOver Clifton Avenue
Location1.7 MI N of Ir 74
RouteInterstate 75
StateOhio
Coordinates39.16202, -84.51653
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating52.9 US tons
Inventory rating27.1 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length209 ft (63.7 m)
Longest span94 ft (28.8 m)
Deck width166 ft (50.7 m)
Roadway width166 ft (50.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic129,511 (2015)
Projected traffic179,761 by 2035
Trucks16%
Lanes on structure9
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ir 75 over Over Clifton Avenue built?

It was built in 2013, making it 12 years old in 2025.

What condition is Ir 75 over Over Clifton Avenue in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Ir 75 over Over Clifton Avenue carry?

About 129,511 vehicles per day (2015 count), of which roughly 16% are trucks.

How long is Ir 75 over Over Clifton Avenue?

The structure is 209 ft (63.7 m) long with a longest span of 94 ft (28.8 m) and a deck 166 ft wide.

Who owns Ir 75 over Over Clifton Avenue?

It is owned by the State Highway Agency.