EB Ir 74 over CR48(NEW Biddinger Road)
GoodHamilton County, Ohio · .69 MI E Oh-In State Line · Structure no. 3107868
- Built
- 1961
- 64 years old, rebuilt 2006
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 187 ft
- 3 main spans
- Daily traffic
- 16,967
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
EB Ir 74 over CR48(NEW Biddinger Road) is a steel continuous stringer/multi-beam or girder carrying EB Ir 74 over CR48(NEW Biddinger Road) in Hamilton County, Ohio. It was built in 1961 and reconstructed in 2006, so it is 64 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 16,967 vehicles a day, roughly 7% of them trucks, projected to reach 23,550 by 2038. The structure is 187 ft (57 m) long and 65 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was EB Ir 74 over CR48(NEW Biddinger Road) built?
It was built in 1961, making it 64 years old in 2025. It was reconstructed in 2006.
What condition is EB Ir 74 over CR48(NEW Biddinger Road) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does EB Ir 74 over CR48(NEW Biddinger Road) carry?
About 16,967 vehicles per day (2018 count), of which roughly 7% are trucks.
How long is EB Ir 74 over CR48(NEW Biddinger Road)?
The structure is 187 ft (57 m) long with a longest span of 71 ft (21.6 m) and a deck 65 ft wide.
Who owns EB Ir 74 over CR48(NEW Biddinger Road)?
It is owned by the State Highway Agency.