US Bridges

Euclid Ave C322 over I71

Fair

Hamilton County, Ohio · .9 MI S of US22 Montgomer · Structure no. 3106934

Built
1969
56 years old
Condition
Fair
inspected March 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
293 ft
2 main spans
Daily traffic
23,182
2018 count
Owner
State
State Highway Agency

About this bridge

Euclid Ave C322 over I71 is a steel continuous stringer/multi-beam or girder carrying Euclid Ave C322 over I71 in Hamilton County, Ohio. It was built in 1969, so it is 56 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 23,182 vehicles a day, roughly 5% of them trucks, projected to reach 182,694 by 2038. The structure is 293 ft (89.3 m) long and 42 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesEuclid Ave C322
CrossesI71
Location.9 MI S of US22 Montgomer
RouteCounty Highway C0322
StateOhio
Coordinates39.19258, -84.38673
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment9: Superior to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadH 20
Structure length293 ft (89.3 m)
Longest span165 ft (50.3 m)
Deck width42 ft (12.9 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic23,182 (2018)
Projected traffic182,694 by 2038
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Euclid Ave C322 over I71 built?

It was built in 1969, making it 56 years old in 2025.

What condition is Euclid Ave C322 over I71 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does Euclid Ave C322 over I71 carry?

About 23,182 vehicles per day (2018 count), of which roughly 5% are trucks.

How long is Euclid Ave C322 over I71?

The structure is 293 ft (89.3 m) long with a longest span of 165 ft (50.3 m) and a deck 42 ft wide.

Who owns Euclid Ave C322 over I71?

It is owned by the State Highway Agency.