US Bridges

2nd ST to NB 71 over Broadway

Fair

Hamilton County, Ohio · .2MI S. of Lytle Tunnel · Structure no. 3105687

Built
2000
25 years old
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
565 ft
3 main spans
Daily traffic
105,150
2009 count
Owner
State
State Highway Agency

About this bridge

2nd ST to NB 71 over Broadway is a prestressed concrete continuous stringer/multi-beam or girder carrying 2nd ST to NB 71 over Broadway in Hamilton County, Ohio. It was built in 2000, so it is 25 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 105,150 vehicles a day, projected to reach 145,948 by 2029. The structure is 565 ft (172.1 m) long and 32 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries2nd ST to NB 71
CrossesBroadway
Location.2MI S. of Lytle Tunnel
RouteInterstate 71
StateOhio
Coordinates39.09878, -84.50645
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67.9 US tons
Inventory rating39.2 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length565 ft (172.1 m)
Longest span203 ft (62 m)
Deck width32 ft (9.9 m)
Roadway width30 ft (9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic105,150 (2009)
Projected traffic145,948 by 2029
Trucks—
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 2nd ST to NB 71 over Broadway built?

It was built in 2000, making it 25 years old in 2025.

What condition is 2nd ST to NB 71 over Broadway in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does 2nd ST to NB 71 over Broadway carry?

About 105,150 vehicles per day (2009 count).

How long is 2nd ST to NB 71 over Broadway?

The structure is 565 ft (172.1 m) long with a longest span of 203 ft (62 m) and a deck 32 ft wide.

Who owns 2nd ST to NB 71 over Broadway?

It is owned by the State Highway Agency.