US Bridges

SR126 Ramp to I75S over Anthony Wayne Ave NSRR

Good

Hamilton County, Ohio · Ramp to Ir 75S · Structure no. 3104907

Built
1990
35 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
255 ft
4 main spans
Daily traffic
9,602
2018 count
Owner
State
State Highway Agency

About this bridge

SR126 Ramp to I75S over Anthony Wayne Ave NSRR is a steel continuous stringer/multi-beam or girder carrying SR126 Ramp to I75S over Anthony Wayne Ave NSRR in Hamilton County, Ohio. It was built in 1990, so it is 35 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,602 vehicles a day, roughly 4% of them trucks, projected to reach 139 by 2038. The structure is 255 ft (77.7 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR126 Ramp to I75S
CrossesAnthony Wayne Ave NSRR
LocationRamp to Ir 75S
RouteState Highway 126
StateOhio
Coordinates39.20434, -84.46849
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating37.8 US tons
Inventory rating29.3 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length255 ft (77.7 m)
Longest span80 ft (24.4 m)
Deck width30 ft (9 m)
Roadway width27 ft (8.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,602 (2018)
Projected traffic139 by 2038
Trucks4%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR126 Ramp to I75S over Anthony Wayne Ave NSRR built?

It was built in 1990, making it 35 years old in 2025.

What condition is SR126 Ramp to I75S over Anthony Wayne Ave NSRR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does SR126 Ramp to I75S over Anthony Wayne Ave NSRR carry?

About 9,602 vehicles per day (2018 count), of which roughly 4% are trucks.

How long is SR126 Ramp to I75S over Anthony Wayne Ave NSRR?

The structure is 255 ft (77.7 m) long with a longest span of 80 ft (24.4 m) and a deck 30 ft wide.

Who owns SR126 Ramp to I75S over Anthony Wayne Ave NSRR?

It is owned by the State Highway Agency.