US Bridges

Bobolink DR CR67 over SR 126

Good

Hamilton County, Ohio · 0.2 MI West of Daly Road · Structure no. 3104702

Built
1996
29 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
183 ft
2 main spans
Daily traffic
248
2015 count
Owner
State
State Highway Agency

About this bridge

Bobolink DR CR67 over SR 126 is a steel continuous stringer/multi-beam or girder carrying Bobolink DR CR67 over SR 126 in Hamilton County, Ohio. It was built in 1996, so it is 29 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 248 vehicles a day, roughly 4% of them trucks, projected to reach 65,014 by 2035. The structure is 183 ft (55.8 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBobolink DR CR67
CrossesSR 126
Location0.2 MI West of Daly Road
RouteCity Street 113
StateOhio
Coordinates39.22081, -84.5339
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating58.5 US tons
Inventory rating45.3 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length183 ft (55.8 m)
Longest span89 ft (27.1 m)
Deck width36 ft (11.1 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic248 (2015)
Projected traffic65,014 by 2035
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Bobolink DR CR67 over SR 126 built?

It was built in 1996, making it 29 years old in 2025.

What condition is Bobolink DR CR67 over SR 126 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Bobolink DR CR67 over SR 126 carry?

About 248 vehicles per day (2015 count), of which roughly 4% are trucks.

How long is Bobolink DR CR67 over SR 126?

The structure is 183 ft (55.8 m) long with a longest span of 89 ft (27.1 m) and a deck 36 ft wide.

Who owns Bobolink DR CR67 over SR 126?

It is owned by the State Highway Agency.