US Bridges

SR 128 over Paddys Run

Good

Hamilton County, Ohio · .6 MI S of New Haven RD · Structure no. 3104486

Built
2003
22 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
171 ft
3 main spans
Daily traffic
6,493
2018 count
Owner
State
State Highway Agency

About this bridge

SR 128 over Paddys Run is a steel continuous stringer/multi-beam or girder carrying SR 128 over Paddys Run in Hamilton County, Ohio. It was built in 2003, so it is 22 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,493 vehicles a day, roughly 8% of them trucks, projected to reach 9,012 by 2038. The structure is 171 ft (52.2 m) long and 47 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesSR 128
CrossesPaddys Run
Location.6 MI S of New Haven RD
RouteState Highway 128
StateOhio
Coordinates39.26657, -84.69034
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length171 ft (52.2 m)
Longest span65 ft (19.8 m)
Deck width47 ft (14.3 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,493 (2018)
Projected traffic9,012 by 2038
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 128 over Paddys Run built?

It was built in 2003, making it 22 years old in 2025.

What condition is SR 128 over Paddys Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does SR 128 over Paddys Run carry?

About 6,493 vehicles per day (2018 count), of which roughly 8% are trucks.

How long is SR 128 over Paddys Run?

The structure is 171 ft (52.2 m) long with a longest span of 65 ft (19.8 m) and a deck 47 ft wide.

Who owns SR 128 over Paddys Run?

It is owned by the State Highway Agency.