US Bridges

US22 over Ir 275

Good

Hamilton County, Ohio · Over I275 · Structure no. 3101053

Built
1966
59 years old, rebuilt 2006
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
307 ft
4 main spans
Daily traffic
25,786
2015 count
Owner
State
State Highway Agency

About this bridge

US22 over Ir 275 is a steel continuous stringer/multi-beam or girder carrying US22 over Ir 275 in Hamilton County, Ohio. It was built in 1966 and reconstructed in 2006, so it is 59 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25,786 vehicles a day, roughly 4% of them trucks, projected to reach 35,791 by 2035. The structure is 307 ft (93.7 m) long and 105 ft wide. If it were closed, the detour would be 11.8 mi (19 km).

CarriesUS22
CrossesIr 275
LocationOver I275
RouteU.S. Route 22
StateOhio
Coordinates39.26095, -84.33848
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating50 US tons
Inventory rating39.2 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 25 or greater
Structure length307 ft (93.7 m)
Longest span101 ft (30.9 m)
Deck width105 ft (31.9 m)
Roadway width84 ft (25.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25,786 (2015)
Projected traffic35,791 by 2035
Trucks4%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed11.8 mi (19 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US22 over Ir 275 built?

It was built in 1966, making it 59 years old in 2025. It was reconstructed in 2006.

What condition is US22 over Ir 275 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does US22 over Ir 275 carry?

About 25,786 vehicles per day (2015 count), of which roughly 4% are trucks.

How long is US22 over Ir 275?

The structure is 307 ft (93.7 m) long with a longest span of 101 ft (30.9 m) and a deck 105 ft wide.

Who owns US22 over Ir 275?

It is owned by the State Highway Agency.