US Bridges

Twp RD 91 over Salt Fork

Fair

Guernsey County, Ohio · .25 MI North of CR 49 · Structure no. 3034887

Built
2002
23 years old
Condition
Fair
inspected June 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
30 ft
1 main span
Daily traffic
209
2015 count
Owner
County
County Highway Agency

About this bridge

Twp RD 91 over Salt Fork is a prestressed concrete box beam or girders - multiple carrying Twp RD 91 over Salt Fork in Guernsey County, Ohio. It was built in 2002, so it is 23 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 209 vehicles a day, roughly 7% of them trucks, projected to reach 290 by 2035. The structure is 30 ft (9.1 m) long and 20 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTwp RD 91
CrossesSalt Fork
Location.25 MI North of CR 49
RouteCounty Highway 91
StateOhio
Coordinates40.03177, -81.34247
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length30 ft (9.1 m)
Longest span28 ft (8.5 m)
Deck width20 ft (6.1 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic209 (2015)
Projected traffic290 by 2035
Trucks7%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Twp RD 91 over Salt Fork built?

It was built in 2002, making it 23 years old in 2025.

What condition is Twp RD 91 over Salt Fork in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does Twp RD 91 over Salt Fork carry?

About 209 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is Twp RD 91 over Salt Fork?

The structure is 30 ft (9.1 m) long with a longest span of 28 ft (8.5 m) and a deck 20 ft wide.

Who owns Twp RD 91 over Salt Fork?

It is owned by the County Highway Agency.