US Bridges

SR 313 over Seneca Lake

Good

Guernsey County, Ohio · 4.6 M E of JCT SR 285 · Structure no. 3005542

Built
1988
37 years old
Condition
Good
inspected December 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
45 ft
1 main span
Daily traffic
842
2015 count
Owner
State
State Highway Agency

About this bridge

SR 313 over Seneca Lake is a prestressed concrete box beam or girders - multiple carrying SR 313 over Seneca Lake in Guernsey County, Ohio. It was built in 1988, so it is 37 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 842 vehicles a day, roughly 3% of them trucks, projected to reach 1,169 by 2035. The structure is 45 ft (13.7 m) long and 24 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesSR 313
CrossesSeneca Lake
Location4.6 M E of JCT SR 285
RouteState Highway 313
StateOhio
Coordinates39.94582, -81.40494
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating56.8 US tons
Inventory rating41.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length45 ft (13.7 m)
Longest span43 ft (13.1 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic842 (2015)
Projected traffic1,169 by 2035
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 313 over Seneca Lake built?

It was built in 1988, making it 37 years old in 2025.

What condition is SR 313 over Seneca Lake in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does SR 313 over Seneca Lake carry?

About 842 vehicles per day (2015 count), of which roughly 3% are trucks.

How long is SR 313 over Seneca Lake?

The structure is 45 ft (13.7 m) long with a longest span of 43 ft (13.1 m) and a deck 24 ft wide.

Who owns SR 313 over Seneca Lake?

It is owned by the State Highway Agency.