South Bound I-77 over Ir 77 Ovr Leatherwood Ck
GoodGuernsey County, Ohio · .4 M S of JCT US 40 · Structure no. 3003000
- Built
- 1956
- 69 years old, rebuilt 2000
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 146 ft
- 3 main spans
- Daily traffic
- 13,409
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
South Bound I-77 over Ir 77 Ovr Leatherwood Ck is a steel continuous stringer/multi-beam or girder carrying South Bound I-77 over Ir 77 Ovr Leatherwood Ck in Guernsey County, Ohio. It was built in 1956 and reconstructed in 2000, so it is 69 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 13,409 vehicles a day, roughly 22% of them trucks, projected to reach 18,612 by 2035. The structure is 146 ft (44.5 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was South Bound I-77 over Ir 77 Ovr Leatherwood Ck built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 2000.
What condition is South Bound I-77 over Ir 77 Ovr Leatherwood Ck in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does South Bound I-77 over Ir 77 Ovr Leatherwood Ck carry?
About 13,409 vehicles per day (2015 count), of which roughly 22% are trucks.
How long is South Bound I-77 over Ir 77 Ovr Leatherwood Ck?
The structure is 146 ft (44.5 m) long with a longest span of 55 ft (16.8 m) and a deck 43 ft wide.
Who owns South Bound I-77 over Ir 77 Ovr Leatherwood Ck?
It is owned by the State Highway Agency.