West Bound I-70 over Ir 70 Ovr Leathrwood Crk
GoodGuernsey County, Ohio · 3.8 M W of JCT SR 285 &40 · Structure no. 3001539
- Built
- 1965
- 60 years old
- Condition
- Good
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 172 ft
- 3 main spans
- Daily traffic
- 15,357
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
West Bound I-70 over Ir 70 Ovr Leathrwood Crk is a steel continuous stringer/multi-beam or girder carrying West Bound I-70 over Ir 70 Ovr Leathrwood Crk in Guernsey County, Ohio. It was built in 1965, so it is 60 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 15,357 vehicles a day, roughly 35% of them trucks, projected to reach 21,316 by 2038. The structure is 172 ft (52.4 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was West Bound I-70 over Ir 70 Ovr Leathrwood Crk built?
It was built in 1965, making it 60 years old in 2025.
What condition is West Bound I-70 over Ir 70 Ovr Leathrwood Crk in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does West Bound I-70 over Ir 70 Ovr Leathrwood Crk carry?
About 15,357 vehicles per day (2018 count), of which roughly 35% are trucks.
How long is West Bound I-70 over Ir 70 Ovr Leathrwood Crk?
The structure is 172 ft (52.4 m) long with a longest span of 65 ft (19.8 m) and a deck 44 ft wide.
Who owns West Bound I-70 over Ir 70 Ovr Leathrwood Crk?
It is owned by the State Highway Agency.