US Bridges

SB Ir 675 over SR 835

Good

Greene County, Ohio · Over SR 835 · Structure no. 2903466

Built
1983
42 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
195 ft
4 main spans
Daily traffic
42,364
2015 count
Owner
State
State Highway Agency

About this bridge

SB Ir 675 over SR 835 is a steel continuous stringer/multi-beam or girder carrying SB Ir 675 over SR 835 in Greene County, Ohio. It was built in 1983, so it is 42 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 42,364 vehicles a day, roughly 17% of them trucks, projected to reach 58,801 by 2035. The structure is 195 ft (59.4 m) long and 58 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSB Ir 675
CrossesSR 835
LocationOver SR 835
RouteInterstate 675
StateOhio
Coordinates39.72781, -84.09072
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length195 ft (59.4 m)
Longest span56 ft (17.1 m)
Deck width58 ft (17.6 m)
Roadway width54 ft (16.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic42,364 (2015)
Projected traffic58,801 by 2035
Trucks17%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SB Ir 675 over SR 835 built?

It was built in 1983, making it 42 years old in 2025.

What condition is SB Ir 675 over SR 835 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does SB Ir 675 over SR 835 carry?

About 42,364 vehicles per day (2015 count), of which roughly 17% are trucks.

How long is SB Ir 675 over SR 835?

The structure is 195 ft (59.4 m) long with a longest span of 56 ft (17.1 m) and a deck 58 ft wide.

Who owns SB Ir 675 over SR 835?

It is owned by the State Highway Agency.