US Bridges

NB Ir 675 over Vineland Trail

Fair

Greene County, Ohio · 1.8 MI S of SR 835 · Structure no. 2903318

Built
1983
42 years old
Condition
Fair
inspected October 2024
Type
Slab
Concrete Continuous
Length
113 ft
3 main spans
Daily traffic
42,364
2015 count
Owner
State
State Highway Agency

About this bridge

NB Ir 675 over Vineland Trail is a concrete continuous slab carrying NB Ir 675 over Vineland Trail in Greene County, Ohio. It was built in 1983, so it is 42 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 42,364 vehicles a day, roughly 17% of them trucks, projected to reach 58,801 by 2035. The structure is 113 ft (34.4 m) long and 60 ft wide.

CarriesNB Ir 675
CrossesVineland Trail
Location1.8 MI S of SR 835
RouteInterstate 675
StateOhio
Coordinates39.70165, -84.09412
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating67.9 US tons
Inventory rating42.9 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length113 ft (34.4 m)
Longest span43 ft (13.1 m)
Deck width60 ft (18.3 m)
Roadway width57 ft (17.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic42,364 (2015)
Projected traffic58,801 by 2035
Trucks17%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was NB Ir 675 over Vineland Trail built?

It was built in 1983, making it 42 years old in 2025.

What condition is NB Ir 675 over Vineland Trail in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does NB Ir 675 over Vineland Trail carry?

About 42,364 vehicles per day (2015 count), of which roughly 17% are trucks.

How long is NB Ir 675 over Vineland Trail?

The structure is 113 ft (34.4 m) long with a longest span of 43 ft (13.1 m) and a deck 60 ft wide.

Who owns NB Ir 675 over Vineland Trail?

It is owned by the State Highway Agency.