Union RD C85 over US35J(US35 Future)
FairGreene County, Ohio · .3 MI W of US 68 · Structure no. 2900696
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 311 ft
- 4 main spans
- Daily traffic
- 814
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
Union RD C85 over US35J(US35 Future) is a steel continuous stringer/multi-beam or girder carrying Union RD C85 over US35J(US35 Future) in Greene County, Ohio. It was built in 1970, so it is 55 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 814 vehicles a day, roughly 5% of them trucks, projected to reach 17,358 by 2035. The structure is 311 ft (94.8 m) long and 36 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Union RD C85 over US35J(US35 Future) built?
It was built in 1970, making it 55 years old in 2025.
What condition is Union RD C85 over US35J(US35 Future) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Union RD C85 over US35J(US35 Future) carry?
About 814 vehicles per day (2015 count), of which roughly 5% are trucks.
How long is Union RD C85 over US35J(US35 Future)?
The structure is 311 ft (94.8 m) long with a longest span of 90 ft (27.4 m) and a deck 36 ft wide.
Who owns Union RD C85 over US35J(US35 Future)?
It is owned by the State Highway Agency.