US Bridges

SR 44 over LA Due Res. 1.23 Mis 422

Good

Geauga County, Ohio · 1.5 MI S USR422 · Structure no. 2800152

Built
1960
65 years old
Condition
Good
inspected September 2024
Type
Slab
Concrete Continuous
Length
106 ft
3 main spans
Daily traffic
7,003
2015 count
Owner
State
State Highway Agency

About this bridge

SR 44 over LA Due Res. 1.23 Mis 422 is a concrete continuous slab carrying SR 44 over LA Due Res. 1.23 Mis 422 in Geauga County, Ohio. It was built in 1960, so it is 65 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,003 vehicles a day, roughly 8% of them trucks, projected to reach 9,720 by 2035. The structure is 106 ft (32.3 m) long and 44 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesSR 44
CrossesLA Due Res. 1.23 Mis 422
Location1.5 MI S USR422
RouteState Highway 44
StateOhio
Coordinates41.36699, -81.22312
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.3 US tons
Inventory rating47.8 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length106 ft (32.3 m)
Longest span40 ft (12.2 m)
Deck width44 ft (13.4 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,003 (2015)
Projected traffic9,720 by 2035
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedDeck rehabilitation with only incidental widening
Estimated improvement cost$900,000
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 44 over LA Due Res. 1.23 Mis 422 built?

It was built in 1960, making it 65 years old in 2025.

What condition is SR 44 over LA Due Res. 1.23 Mis 422 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does SR 44 over LA Due Res. 1.23 Mis 422 carry?

About 7,003 vehicles per day (2015 count), of which roughly 8% are trucks.

How long is SR 44 over LA Due Res. 1.23 Mis 422?

The structure is 106 ft (32.3 m) long with a longest span of 40 ft (12.2 m) and a deck 44 ft wide.

Who owns SR 44 over LA Due Res. 1.23 Mis 422?

It is owned by the State Highway Agency.