US Bridges

Bridge 24G.2 over Branch 3 of Tiffin River

Good

Fulton County, Ohio · TR 24 0.2 Mi. N. TR G · Structure no. 2634938

Built
2020
5 years old
Condition
Good
inspected November 2024
Type
Culvert
Concrete
Length
30 ft
1 main span
Daily traffic
1,088
2015 count
Owner
County
County Highway Agency

About this bridge

Bridge 24G.2 over Branch 3 of Tiffin River is a concrete culvert carrying Bridge 24G.2 over Branch 3 of Tiffin River in Fulton County, Ohio. It was built in 2020, so it is 5 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,088 vehicles a day, roughly 20% of them trucks, projected to reach 1,828 by 2035. The structure is 30 ft (9.1 m) long. If it were closed, the detour would be 3.7 mi (6 km).

CarriesBridge 24G.2
CrossesBranch 3 of Tiffin River
LocationTR 24 0.2 Mi. N. TR G
RouteCounty Highway T0024
StateOhio
Coordinates41.5743, -84.32608
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert9 ExcellentNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length30 ft (9.1 m)
Longest span28 ft (8.5 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,088 (2015)
Projected traffic1,828 by 2035
Trucks20%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Bridge 24G.2 over Branch 3 of Tiffin River built?

It was built in 2020, making it 5 years old in 2025.

What condition is Bridge 24G.2 over Branch 3 of Tiffin River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Bridge 24G.2 over Branch 3 of Tiffin River carry?

About 1,088 vehicles per day (2015 count), of which roughly 20% are trucks.

How long is Bridge 24G.2 over Branch 3 of Tiffin River?

The structure is 30 ft (9.1 m) long with a longest span of 28 ft (8.5 m).

Who owns Bridge 24G.2 over Branch 3 of Tiffin River?

It is owned by the County Highway Agency.