US Bridges

Bridge M23.9 over Stag Run

Good

Fulton County, Ohio · 0.9 Mi. W. of CR 23 · Structure no. 2631504

Built
1958
67 years old, rebuilt 2017
Condition
Good
inspected November 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
60 ft
1 main span
Daily traffic
88
2015 count
Owner
County
County Highway Agency

About this bridge

Bridge M23.9 over Stag Run is a prestressed concrete box beam or girders - multiple carrying Bridge M23.9 over Stag Run in Fulton County, Ohio. It was built in 1958 and reconstructed in 2017, so it is 67 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 88 vehicles a day, roughly 16% of them trucks, projected to reach 122 by 2035. The structure is 60 ft (18.3 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesBridge M23.9
CrossesStag Run
Location0.9 Mi. W. of CR 23
RouteCounty Highway C000M
StateOhio
Coordinates41.63726, -84.32451
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation9: Superior to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating78.6 US tons
Inventory rating60.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length60 ft (18.3 m)
Longest span59 ft (18 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic88 (2015)
Projected traffic122 by 2035
Trucks16%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Bridge M23.9 over Stag Run built?

It was built in 1958, making it 67 years old in 2025. It was reconstructed in 2017.

What condition is Bridge M23.9 over Stag Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Bridge M23.9 over Stag Run carry?

About 88 vehicles per day (2015 count), of which roughly 16% are trucks.

How long is Bridge M23.9 over Stag Run?

The structure is 60 ft (18.3 m) long with a longest span of 59 ft (18 m) and a deck 28 ft wide.

Who owns Bridge M23.9 over Stag Run?

It is owned by the County Highway Agency.