US Bridges

Britton Parkway over Bikeway Hayden Run

Good

Franklin County, Ohio · 480 Ft N of Hayden Run(r) · Structure no. 2565749

Built
2006
19 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
103 ft
1 main span
Daily traffic
3,085
2015 count
Owner
City
City or Municipal Highway Agency

About this bridge

Britton Parkway over Bikeway Hayden Run is a prestressed concrete stringer/multi-beam or girder carrying Britton Parkway over Bikeway Hayden Run in Franklin County, Ohio. It was built in 2006, so it is 19 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,085 vehicles a day, roughly 7% of them trucks, projected to reach 4,282 by 2035. The structure is 103 ft (31.4 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBritton Parkway
CrossesBikeway Hayden Run
Location480 Ft N of Hayden Run(r)
RouteCity Street 4249
StateOhio
Coordinates40.06336, -83.13803
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating90.7 US tons
Inventory rating45.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length103 ft (31.4 m)
Longest span101 ft (30.8 m)
Deck width36 ft (10.9 m)
Roadway width27 ft (8.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,085 (2015)
Projected traffic4,282 by 2035
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Britton Parkway over Bikeway Hayden Run built?

It was built in 2006, making it 19 years old in 2025.

What condition is Britton Parkway over Bikeway Hayden Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Britton Parkway over Bikeway Hayden Run carry?

About 3,085 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is Britton Parkway over Bikeway Hayden Run?

The structure is 103 ft (31.4 m) long with a longest span of 101 ft (30.8 m) and a deck 36 ft wide.

Who owns Britton Parkway over Bikeway Hayden Run?

It is owned by the City or Municipal Highway Agency.