US Bridges

Reyn.-New Albany over French Run(rey.New Alb)

Fair

Franklin County, Ohio · 0.4 MI North of Main ST · Structure no. 2531305

Built
1956
69 years old
Condition
Fair
inspected December 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
39 ft
1 main span
Daily traffic
12,909
2015 count
Owner
County
County Highway Agency

About this bridge

Reyn.-New Albany over French Run(rey.New Alb) is a prestressed concrete box beam or girders - multiple carrying Reyn.-New Albany over French Run(rey.New Alb) in Franklin County, Ohio. It was built in 1956, so it is 69 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 12,909 vehicles a day, roughly 4% of them trucks, projected to reach 17,918 by 2035. The structure is 39 ft (11.9 m) long and 52 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesReyn.-New Albany
CrossesFrench Run(rey.New Alb)
Location0.4 MI North of Main ST
RouteCounty Highway C0006
StateOhio
Coordinates39.95586, -82.80273
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating46.1 US tons
Inventory rating20.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadH 20
Structure length39 ft (11.9 m)
Longest span38 ft (11.6 m)
Deck width52 ft (16 m)
Roadway width41 ft (12.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,909 (2015)
Projected traffic17,918 by 2035
Trucks4%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Reyn.-New Albany over French Run(rey.New Alb) built?

It was built in 1956, making it 69 years old in 2025.

What condition is Reyn.-New Albany over French Run(rey.New Alb) in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does Reyn.-New Albany over French Run(rey.New Alb) carry?

About 12,909 vehicles per day (2015 count), of which roughly 4% are trucks.

How long is Reyn.-New Albany over French Run(rey.New Alb)?

The structure is 39 ft (11.9 m) long with a longest span of 38 ft (11.6 m) and a deck 52 ft wide.

Who owns Reyn.-New Albany over French Run(rey.New Alb)?

It is owned by the County Highway Agency.