SR 315NB over RAMP(315NB to W.N.Brodwy
GoodFranklin County, Ohio · 5.91 MI N of I70 · Structure no. 2515520
- Built
- 1980
- 45 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 172 ft
- 3 main spans
- Daily traffic
- 119,933
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
SR 315NB over RAMP(315NB to W.N.Brodwy is a steel continuous stringer/multi-beam or girder carrying SR 315NB over RAMP(315NB to W.N.Brodwy in Franklin County, Ohio. It was built in 1980, so it is 45 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 119,933 vehicles a day, roughly 3% of them trucks, projected to reach 166,467 by 2035. The structure is 172 ft (52.5 m) long and 120 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 315NB over RAMP(315NB to W.N.Brodwy built?
It was built in 1980, making it 45 years old in 2025.
What condition is SR 315NB over RAMP(315NB to W.N.Brodwy in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does SR 315NB over RAMP(315NB to W.N.Brodwy carry?
About 119,933 vehicles per day (2015 count), of which roughly 3% are trucks.
How long is SR 315NB over RAMP(315NB to W.N.Brodwy?
The structure is 172 ft (52.5 m) long with a longest span of 64 ft (19.4 m) and a deck 120 ft wide.
Who owns SR 315NB over RAMP(315NB to W.N.Brodwy?
It is owned by the State Highway Agency.