NB I-270 over Big Walnut/Noe Bixby RD
FairFranklin County, Ohio · 0.83 MI S of IR70 · Structure no. 2514494
- Built
- 1968
- 57 years old
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 459 ft
- 4 main spans
- Daily traffic
- 38,298
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
NB I-270 over Big Walnut/Noe Bixby RD is a steel continuous stringer/multi-beam or girder carrying NB I-270 over Big Walnut/Noe Bixby RD in Franklin County, Ohio. It was built in 1968, so it is 57 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 38,298 vehicles a day, roughly 13% of them trucks, projected to reach 53,158 by 2035. The structure is 459 ft (139.9 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NB I-270 over Big Walnut/Noe Bixby RD built?
It was built in 1968, making it 57 years old in 2025.
What condition is NB I-270 over Big Walnut/Noe Bixby RD in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does NB I-270 over Big Walnut/Noe Bixby RD carry?
About 38,298 vehicles per day (2015 count), of which roughly 13% are trucks.
How long is NB I-270 over Big Walnut/Noe Bixby RD?
The structure is 459 ft (139.9 m) long with a longest span of 122 ft (37.2 m) and a deck 48 ft wide.
Who owns NB I-270 over Big Walnut/Noe Bixby RD?
It is owned by the State Highway Agency.