US Bridges

Easton Way over IR-270 670W & 161 Ramps

Good

Franklin County, Ohio · 02.38 MI S.Of SR161 · Structure no. 2512041

Built
1997
28 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
364 ft
4 main spans
Daily traffic
22,067
2015 count
Owner
State
State Highway Agency

About this bridge

Easton Way over IR-270 670W & 161 Ramps is a steel continuous stringer/multi-beam or girder carrying Easton Way over IR-270 670W & 161 Ramps in Franklin County, Ohio. It was built in 1997, so it is 28 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 22,067 vehicles a day, roughly 2% of them trucks, projected to reach 30,629 by 2035. The structure is 364 ft (110.8 m) long and 75 ft wide.

CarriesEaston Way
CrossesIR-270 670W & 161 Ramps
Location02.38 MI S.Of SR161
RouteCity Street 4356
StateOhio
Coordinates40.04807, -82.90286
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating52.1 US tons
Inventory rating40 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length364 ft (110.8 m)
Longest span105 ft (32 m)
Deck width75 ft (22.9 m)
Roadway width72 ft (21.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,067 (2015)
Projected traffic30,629 by 2035
Trucks2%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Easton Way over IR-270 670W & 161 Ramps built?

It was built in 1997, making it 28 years old in 2025.

What condition is Easton Way over IR-270 670W & 161 Ramps in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Easton Way over IR-270 670W & 161 Ramps carry?

About 22,067 vehicles per day (2015 count), of which roughly 2% are trucks.

How long is Easton Way over IR-270 670W & 161 Ramps?

The structure is 364 ft (110.8 m) long with a longest span of 105 ft (32 m) and a deck 75 ft wide.

Who owns Easton Way over IR-270 670W & 161 Ramps?

It is owned by the State Highway Agency.