US Bridges

270 Ramp over Ramp 316-E over Ramp 315

Good

Franklin County, Ohio · 1.13MI W of SR 315 · Structure no. 2510758

Built
2017
8 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
138 ft
3 main spans
Daily traffic
2,110
2008 count
Owner
State
State Highway Agency

About this bridge

270 Ramp over Ramp 316-E over Ramp 315 is a steel continuous stringer/multi-beam or girder carrying 270 Ramp over Ramp 316-E over Ramp 315 in Franklin County, Ohio. It was built in 2017, so it is 8 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,110 vehicles a day, roughly 5% of them trucks, projected to reach 3,399 by 2028. The structure is 138 ft (42.2 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries270 Ramp
CrossesRamp 316-E over Ramp 315
Location1.13MI W of SR 315
RouteInterstate 270
StateOhio
Coordinates40.11196, -83.03816
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating91.1 US tons
Inventory rating70.3 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length138 ft (42.2 m)
Longest span52 ft (16 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,110 (2008)
Projected traffic3,399 by 2028
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 270 Ramp over Ramp 316-E over Ramp 315 built?

It was built in 2017, making it 8 years old in 2025.

What condition is 270 Ramp over Ramp 316-E over Ramp 315 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does 270 Ramp over Ramp 316-E over Ramp 315 carry?

About 2,110 vehicles per day (2008 count), of which roughly 5% are trucks.

How long is 270 Ramp over Ramp 316-E over Ramp 315?

The structure is 138 ft (42.2 m) long with a longest span of 52 ft (16 m) and a deck 31 ft wide.

Who owns 270 Ramp over Ramp 316-E over Ramp 315?

It is owned by the State Highway Agency.