US Bridges

Park Road (CR-19) over Under Park Road (CR-19)

Good

Franklin County, Ohio · 0.65 MI S of Del CO Line · Structure no. 2508354

Built
2005
20 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
241 ft
2 main spans
Daily traffic
13,080
2017 count
Owner
State
State Highway Agency

About this bridge

Park Road (CR-19) over Under Park Road (CR-19) is a steel continuous stringer/multi-beam or girder carrying Park Road (CR-19) over Under Park Road (CR-19) in Franklin County, Ohio. It was built in 2005, so it is 20 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,080 vehicles a day, roughly 7% of them trucks, projected to reach 18,155 by 2037. The structure is 241 ft (73.5 m) long and 43 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesPark Road (CR-19)
CrossesUnder Park Road (CR-19)
Location0.65 MI S of Del CO Line
RouteCounty Highway C0019
StateOhio
Coordinates40.12558, -82.97255
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating66 US tons
Inventory rating50.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 25 or greater
Structure length241 ft (73.5 m)
Longest span126 ft (38.3 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,080 (2017)
Projected traffic18,155 by 2037
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Park Road (CR-19) over Under Park Road (CR-19) built?

It was built in 2005, making it 20 years old in 2025.

What condition is Park Road (CR-19) over Under Park Road (CR-19) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Park Road (CR-19) over Under Park Road (CR-19) carry?

About 13,080 vehicles per day (2017 count), of which roughly 7% are trucks.

How long is Park Road (CR-19) over Under Park Road (CR-19)?

The structure is 241 ft (73.5 m) long with a longest span of 126 ft (38.3 m) and a deck 43 ft wide.

Who owns Park Road (CR-19) over Under Park Road (CR-19)?

It is owned by the State Highway Agency.