US Bridges

Interstate 670 over Ramp over Second Ave

Good

Franklin County, Ohio · RAMP-IR670 WB to IR71NB · Structure no. 2506467

Built
1995
30 years old
Condition
Good
inspected July 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
140 ft
3 main spans
Daily traffic
111,799
2015 count
Owner
State
State Highway Agency

About this bridge

Interstate 670 over Ramp over Second Ave is a prestressed concrete box beam or girders - multiple carrying Interstate 670 over Ramp over Second Ave in Franklin County, Ohio. It was built in 1995, so it is 30 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 111,799 vehicles a day, roughly 15% of them trucks, projected to reach 155,177 by 2035. The structure is 140 ft (42.6 m) long and 44 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

CarriesInterstate 670
CrossesRamp over Second Ave
LocationRAMP-IR670 WB to IR71NB
RouteInterstate 71
StateOhio
Coordinates39.98139, -82.98408
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment6: Equal to present minimum criteria
Operating rating60.7 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length140 ft (42.6 m)
Longest span55 ft (16.8 m)
Deck width44 ft (13.4 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic111,799 (2015)
Projected traffic155,177 by 2035
Trucks15%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Interstate 670 over Ramp over Second Ave built?

It was built in 1995, making it 30 years old in 2025.

What condition is Interstate 670 over Ramp over Second Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Interstate 670 over Ramp over Second Ave carry?

About 111,799 vehicles per day (2015 count), of which roughly 15% are trucks.

How long is Interstate 670 over Ramp over Second Ave?

The structure is 140 ft (42.6 m) long with a longest span of 55 ft (16.8 m) and a deck 44 ft wide.

Who owns Interstate 670 over Ramp over Second Ave?

It is owned by the State Highway Agency.