SR 315 C over Over Rmp Na 315S-NEIL Av
GoodFranklin County, Ohio · Goodale St. Ovr Ramp Na · Structure no. 2506254
- Built
- 1998
- 27 years old, rebuilt 2004
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 83 ft
- 1 main span
- Daily traffic
- 17,913
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
SR 315 C over Over Rmp Na 315S-NEIL Av is a steel stringer/multi-beam or girder carrying SR 315 C over Over Rmp Na 315S-NEIL Av in Franklin County, Ohio. It was built in 1998 and reconstructed in 2004, so it is 27 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 17,913 vehicles a day, roughly 4% of them trucks, projected to reach 24,863 by 2038. The structure is 83 ft (25.4 m) long and 67 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 315 C over Over Rmp Na 315S-NEIL Av built?
It was built in 1998, making it 27 years old in 2025. It was reconstructed in 2004.
What condition is SR 315 C over Over Rmp Na 315S-NEIL Av in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does SR 315 C over Over Rmp Na 315S-NEIL Av carry?
About 17,913 vehicles per day (2018 count), of which roughly 4% are trucks.
How long is SR 315 C over Over Rmp Na 315S-NEIL Av?
The structure is 83 ft (25.4 m) long with a longest span of 83 ft (25.4 m) and a deck 67 ft wide.
Who owns SR 315 C over Over Rmp Na 315S-NEIL Av?
It is owned by the State Highway Agency.