US Bridges

SR 315 C over Over Rmp Na 315S-NEIL Av

Good

Franklin County, Ohio · Goodale St. Ovr Ramp Na · Structure no. 2506254

Built
1998
27 years old, rebuilt 2004
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
83 ft
1 main span
Daily traffic
17,913
2018 count
Owner
State
State Highway Agency

About this bridge

SR 315 C over Over Rmp Na 315S-NEIL Av is a steel stringer/multi-beam or girder carrying SR 315 C over Over Rmp Na 315S-NEIL Av in Franklin County, Ohio. It was built in 1998 and reconstructed in 2004, so it is 27 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17,913 vehicles a day, roughly 4% of them trucks, projected to reach 24,863 by 2038. The structure is 83 ft (25.4 m) long and 67 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesSR 315 C
CrossesOver Rmp Na 315S-NEIL Av
LocationGoodale St. Ovr Ramp Na
RouteState Highway 315
StateOhio
Coordinates39.9737, -83.01666
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating44.6 US tons
Inventory rating34.6 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length83 ft (25.4 m)
Longest span83 ft (25.4 m)
Deck width67 ft (20.3 m)
Roadway width58 ft (17.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,913 (2018)
Projected traffic24,863 by 2038
Trucks4%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 315 C over Over Rmp Na 315S-NEIL Av built?

It was built in 1998, making it 27 years old in 2025. It was reconstructed in 2004.

What condition is SR 315 C over Over Rmp Na 315S-NEIL Av in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does SR 315 C over Over Rmp Na 315S-NEIL Av carry?

About 17,913 vehicles per day (2018 count), of which roughly 4% are trucks.

How long is SR 315 C over Over Rmp Na 315S-NEIL Av?

The structure is 83 ft (25.4 m) long with a longest span of 83 ft (25.4 m) and a deck 67 ft wide.

Who owns SR 315 C over Over Rmp Na 315S-NEIL Av?

It is owned by the State Highway Agency.