Third ST (US23) over Over I-670
GoodFranklin County, Ohio · .19 MI East of High ST · Structure no. 2500914
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 294 ft
- 4 main spans
- Daily traffic
- 17,874
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
Third ST (US23) over Over I-670 is a steel continuous stringer/multi-beam or girder carrying Third ST (US23) over Over I-670 in Franklin County, Ohio. It was built in 2003, so it is 22 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 17,874 vehicles a day, roughly 7% of them trucks, projected to reach 24,809 by 2035. The structure is 294 ft (89.5 m) long and 68 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Third ST (US23) over Over I-670 built?
It was built in 2003, making it 22 years old in 2025.
What condition is Third ST (US23) over Over I-670 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does Third ST (US23) over Over I-670 carry?
About 17,874 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is Third ST (US23) over Over I-670?
The structure is 294 ft (89.5 m) long with a longest span of 88 ft (26.7 m) and a deck 68 ft wide.
Who owns Third ST (US23) over Over I-670?
It is owned by the State Highway Agency.