Glaze Road-Tr 131 over N F Paint Creek- Glaze R
FairFayette County, Ohio · 0.6 MI W Bloom Nh · Structure no. 2432811
- Built
- 1982
- 43 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 118 ft
- 3 main spans
- Daily traffic
- 351
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Glaze Road-Tr 131 over N F Paint Creek- Glaze R is a steel continuous stringer/multi-beam or girder carrying Glaze Road-Tr 131 over N F Paint Creek- Glaze R in Fayette County, Ohio. It was built in 1982, so it is 43 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 351 vehicles a day, roughly 7% of them trucks, projected to reach 487 by 2035. The structure is 118 ft (36 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Glaze Road-Tr 131 over N F Paint Creek- Glaze R built?
It was built in 1982, making it 43 years old in 2025.
What condition is Glaze Road-Tr 131 over N F Paint Creek- Glaze R in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Glaze Road-Tr 131 over N F Paint Creek- Glaze R carry?
About 351 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is Glaze Road-Tr 131 over N F Paint Creek- Glaze R?
The structure is 118 ft (36 m) long with a longest span of 45 ft (13.7 m) and a deck 24 ft wide.
Who owns Glaze Road-Tr 131 over N F Paint Creek- Glaze R?
It is owned by the County Highway Agency.