New US 35 over Over Ford Rd/Sugar Creek
GoodFayette County, Ohio · 1.29 MI West of Palmer RD · Structure no. 2400928
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 263 ft
- 2 main spans
- Daily traffic
- 5,687
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
New US 35 over Over Ford Rd/Sugar Creek is a prestressed concrete stringer/multi-beam or girder carrying New US 35 over Over Ford Rd/Sugar Creek in Fayette County, Ohio. It was built in 2003, so it is 22 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,687 vehicles a day, roughly 38% of them trucks, projected to reach 7,894 by 2038. The structure is 263 ft (80.1 m) long and 55 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was New US 35 over Over Ford Rd/Sugar Creek built?
It was built in 2003, making it 22 years old in 2025.
What condition is New US 35 over Over Ford Rd/Sugar Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does New US 35 over Over Ford Rd/Sugar Creek carry?
About 5,687 vehicles per day (2015 count), of which roughly 38% are trucks.
How long is New US 35 over Over Ford Rd/Sugar Creek?
The structure is 263 ft (80.1 m) long with a longest span of 129 ft (39.3 m) and a deck 55 ft wide.
Who owns New US 35 over Over Ford Rd/Sugar Creek?
It is owned by the State Highway Agency.