WAL-06 New Salem over Walnut Cr(new Salem RD N
FairFairfield County, Ohio · 0.3 MI N of Geiger RD NE · Structure no. 2342065
- Built
- 1900
- 125 years old, rebuilt 1987
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 45 ft
- 1 main span
- Daily traffic
- 188
- 1992 count
- Owner
- County
- County Highway Agency
About this bridge
WAL-06 New Salem over Walnut Cr(new Salem RD N is a steel stringer/multi-beam or girder carrying WAL-06 New Salem over Walnut Cr(new Salem RD N in Fairfield County, Ohio. It was built in 1900 and reconstructed in 1987, so it is 125 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 188 vehicles a day, projected to reach 261 by 2012. The structure is 45 ft (13.7 m) long and 20 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was WAL-06 New Salem over Walnut Cr(new Salem RD N built?
It was built in 1900, making it 125 years old in 2025. It was reconstructed in 1987.
What condition is WAL-06 New Salem over Walnut Cr(new Salem RD N in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does WAL-06 New Salem over Walnut Cr(new Salem RD N carry?
About 188 vehicles per day (1992 count).
How long is WAL-06 New Salem over Walnut Cr(new Salem RD N?
The structure is 45 ft (13.7 m) long with a longest span of 43 ft (13.1 m) and a deck 20 ft wide.
Who owns WAL-06 New Salem over Walnut Cr(new Salem RD N?
It is owned by the County Highway Agency.