BER-22 Pmp Station over Tributary Hocking River
GoodFairfield County, Ohio · 0.1 Miles W. of CR 86 · Structure no. 2333112
- Built
- 1996
- 29 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 36 ft
- 1 main span
- Daily traffic
- 126
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
BER-22 Pmp Station over Tributary Hocking River is a steel stringer/multi-beam or girder carrying BER-22 Pmp Station over Tributary Hocking River in Fairfield County, Ohio. It was built in 1996, so it is 29 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 126 vehicles a day, roughly 8% of them trucks, projected to reach 175 by 2035. The structure is 36 ft (11 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was BER-22 Pmp Station over Tributary Hocking River built?
It was built in 1996, making it 29 years old in 2025.
What condition is BER-22 Pmp Station over Tributary Hocking River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does BER-22 Pmp Station over Tributary Hocking River carry?
About 126 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is BER-22 Pmp Station over Tributary Hocking River?
The structure is 36 ft (11 m) long with a longest span of 35 ft (10.7 m) and a deck 24 ft wide.
Who owns BER-22 Pmp Station over Tributary Hocking River?
It is owned by the County Highway Agency.