RUS-08 Jerusalem over Rush Cr(jerusalm RD Se)
GoodFairfield County, Ohio · 0.2MI E of S.R.37 · Structure no. 2331543
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected December 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 115 ft
- 3 main spans
- Daily traffic
- 155
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
RUS-08 Jerusalem over Rush Cr(jerusalm RD Se) is a prestressed concrete continuous box beam or girders - multiple carrying RUS-08 Jerusalem over Rush Cr(jerusalm RD Se) in Fairfield County, Ohio. It was built in 2006, so it is 19 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 155 vehicles a day, roughly 8% of them trucks, projected to reach 215 by 2035. The structure is 115 ft (35.1 m) long and 30 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RUS-08 Jerusalem over Rush Cr(jerusalm RD Se) built?
It was built in 2006, making it 19 years old in 2025.
What condition is RUS-08 Jerusalem over Rush Cr(jerusalm RD Se) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does RUS-08 Jerusalem over Rush Cr(jerusalm RD Se) carry?
About 155 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is RUS-08 Jerusalem over Rush Cr(jerusalm RD Se)?
The structure is 115 ft (35.1 m) long with a longest span of 45 ft (13.7 m) and a deck 30 ft wide.
Who owns RUS-08 Jerusalem over Rush Cr(jerusalm RD Se)?
It is owned by the County Highway Agency.