US Bridges

SR 360 over Buckeye Lake Spillway

Good

Fairfield County, Ohio · .4 M E of JCT SR 79 · Structure no. 2303477

Built
1992
33 years old
Condition
Good
inspected July 2024
Type
Slab
Concrete Continuous
Length
124 ft
3 main spans
Daily traffic
509
2015 count
Owner
State
State Highway Agency

About this bridge

SR 360 over Buckeye Lake Spillway is a concrete continuous slab carrying SR 360 over Buckeye Lake Spillway in Fairfield County, Ohio. It was built in 1992, so it is 33 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 509 vehicles a day, roughly 10% of them trucks, projected to reach 706 by 2035. The structure is 124 ft (37.7 m) long and 41 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR 360
CrossesBuckeye Lake Spillway
Location.4 M E of JCT SR 79
RouteState Highway 360
StateOhio
Coordinates39.92165, -82.51492
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating46.4 US tons
Inventory rating27.9 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length124 ft (37.7 m)
Longest span47 ft (14.2 m)
Deck width41 ft (12.6 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic509 (2015)
Projected traffic706 by 2035
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 360 over Buckeye Lake Spillway built?

It was built in 1992, making it 33 years old in 2025.

What condition is SR 360 over Buckeye Lake Spillway in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does SR 360 over Buckeye Lake Spillway carry?

About 509 vehicles per day (2015 count), of which roughly 10% are trucks.

How long is SR 360 over Buckeye Lake Spillway?

The structure is 124 ft (37.7 m) long with a longest span of 47 ft (14.2 m) and a deck 41 ft wide.

Who owns SR 360 over Buckeye Lake Spillway?

It is owned by the State Highway Agency.