Furnace RD TR78 over Furnace Rd/Chappel Creek
FairErie County, Ohio · F-307 · Structure no. 2230704
- Built
- 1975
- 50 years old, rebuilt 2007
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 76 ft
- 1 main span
- Daily traffic
- 324
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Furnace RD TR78 over Furnace Rd/Chappel Creek is a steel stringer/multi-beam or girder carrying Furnace RD TR78 over Furnace Rd/Chappel Creek in Erie County, Ohio. It was built in 1975 and reconstructed in 2007, so it is 50 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 324 vehicles a day, roughly 7% of them trucks, projected to reach 450 by 2035. The structure is 76 ft (23.2 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Furnace RD TR78 over Furnace Rd/Chappel Creek built?
It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2007.
What condition is Furnace RD TR78 over Furnace Rd/Chappel Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does Furnace RD TR78 over Furnace Rd/Chappel Creek carry?
About 324 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is Furnace RD TR78 over Furnace Rd/Chappel Creek?
The structure is 76 ft (23.2 m) long with a longest span of 69 ft (21 m) and a deck 28 ft wide.
Who owns Furnace RD TR78 over Furnace Rd/Chappel Creek?
It is owned by the County Highway Agency.