US Bridges

Wikel RD TR-127 over I80 Ohio Turnpike

Good

Erie County, Ohio · 3.3MI East of Exit 7 · Structure no. 2229579

Built
1954
71 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
192 ft
2 main spans
Daily traffic
388
2015 count
Owner
Toll Authority
State Toll Authority

About this bridge

Wikel RD TR-127 over I80 Ohio Turnpike is a steel continuous stringer/multi-beam or girder carrying Wikel RD TR-127 over I80 Ohio Turnpike in Erie County, Ohio. It was built in 1954, so it is 71 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 388 vehicles a day, roughly 7% of them trucks, projected to reach 539 by 2035. The structure is 192 ft (58.5 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWikel RD TR-127
CrossesI80 Ohio Turnpike
Location3.3MI East of Exit 7
RouteCounty Highway T0127
StateOhio
Coordinates41.32525, -82.54343
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56.8 US tons
Inventory rating32.2 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2 (+2 approach)
Design loadH 10
Structure length192 ft (58.5 m)
Longest span66 ft (20.1 m)
Deck width30 ft (9.1 m)
Roadway width27 ft (8.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic388 (2015)
Projected traffic539 by 2035
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Wikel RD TR-127 over I80 Ohio Turnpike built?

It was built in 1954, making it 71 years old in 2025.

What condition is Wikel RD TR-127 over I80 Ohio Turnpike in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Wikel RD TR-127 over I80 Ohio Turnpike carry?

About 388 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is Wikel RD TR-127 over I80 Ohio Turnpike?

The structure is 192 ft (58.5 m) long with a longest span of 66 ft (20.1 m) and a deck 30 ft wide.

Who owns Wikel RD TR-127 over I80 Ohio Turnpike?

It is owned by the State Toll Authority.