US Bridges

Thomas RD TR-114 over I80 Ohio Turnpike

Good

Erie County, Ohio · 3.5MI West of Exit 7 · Structure no. 2229269

Built
1997
28 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
216 ft
4 main spans
Daily traffic
400
1996 count
Owner
Toll Authority
State Toll Authority

About this bridge

Thomas RD TR-114 over I80 Ohio Turnpike is a steel continuous stringer/multi-beam or girder carrying Thomas RD TR-114 over I80 Ohio Turnpike in Erie County, Ohio. It was built in 1997, so it is 28 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 400 vehicles a day, roughly 6% of them trucks, projected to reach 555 by 2016. The structure is 216 ft (65.8 m) long and 31 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesThomas RD TR-114
CrossesI80 Ohio Turnpike
Location3.5MI West of Exit 7
RouteCounty Highway 114
StateOhio
Coordinates41.33363, -82.67364
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating75.4 US tons
Inventory rating45 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length216 ft (65.8 m)
Longest span67 ft (20.4 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic400 (1996)
Projected traffic555 by 2016
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Thomas RD TR-114 over I80 Ohio Turnpike built?

It was built in 1997, making it 28 years old in 2025.

What condition is Thomas RD TR-114 over I80 Ohio Turnpike in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Thomas RD TR-114 over I80 Ohio Turnpike carry?

About 400 vehicles per day (1996 count), of which roughly 6% are trucks.

How long is Thomas RD TR-114 over I80 Ohio Turnpike?

The structure is 216 ft (65.8 m) long with a longest span of 67 ft (20.4 m) and a deck 31 ft wide.

Who owns Thomas RD TR-114 over I80 Ohio Turnpike?

It is owned by the State Toll Authority.