US Bridges

Ot Ramp Exit 110 over I80 Ohio Turnpike

Fair

Erie County, Ohio · 8.2 MI West of Exit 118 · Structure no. 2229056

Built
1994
31 years old
Condition
Fair
inspected March 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
326 ft
4 main spans
Daily traffic
2,512
1993 count
Owner
Toll Authority
State Toll Authority

About this bridge

Ot Ramp Exit 110 over I80 Ohio Turnpike is a steel continuous stringer/multi-beam or girder carrying Ot Ramp Exit 110 over I80 Ohio Turnpike in Erie County, Ohio. It was built in 1994, so it is 31 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,512 vehicles a day, roughly 11% of them trucks, projected to reach 3,487 by 2013. The structure is 326 ft (99.4 m) long and 68 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesOt Ramp Exit 110
CrossesI80 Ohio Turnpike
Location8.2 MI West of Exit 118
StateOhio
Coordinates41.34048, -82.76586
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating95.7 US tons
Inventory rating57.1 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length326 ft (99.4 m)
Longest span93 ft (28.3 m)
Deck width68 ft (20.7 m)
Roadway width65 ft (19.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,512 (1993)
Projected traffic3,487 by 2013
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed9.9 mi (16 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ot Ramp Exit 110 over I80 Ohio Turnpike built?

It was built in 1994, making it 31 years old in 2025.

What condition is Ot Ramp Exit 110 over I80 Ohio Turnpike in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does Ot Ramp Exit 110 over I80 Ohio Turnpike carry?

About 2,512 vehicles per day (1993 count), of which roughly 11% are trucks.

How long is Ot Ramp Exit 110 over I80 Ohio Turnpike?

The structure is 326 ft (99.4 m) long with a longest span of 93 ft (28.3 m) and a deck 68 ft wide.

Who owns Ot Ramp Exit 110 over I80 Ohio Turnpike?

It is owned by the State Toll Authority.