SR 2 over Over Ns/Conrail
GoodErie County, Ohio · 2.77 MI E US 250 · Structure no. 2201119
- Built
- 1961
- 64 years old, rebuilt 2000
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 281 ft
- 3 main spans
- Daily traffic
- 9,953
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
SR 2 over Over Ns/Conrail is a steel continuous stringer/multi-beam or girder carrying SR 2 over Over Ns/Conrail in Erie County, Ohio. It was built in 1961 and reconstructed in 2000, so it is 64 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,953 vehicles a day, roughly 14% of them trucks, projected to reach 13,815 by 2035. The structure is 281 ft (85.7 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 2 over Over Ns/Conrail built?
It was built in 1961, making it 64 years old in 2025. It was reconstructed in 2000.
What condition is SR 2 over Over Ns/Conrail in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does SR 2 over Over Ns/Conrail carry?
About 9,953 vehicles per day (2015 count), of which roughly 14% are trucks.
How long is SR 2 over Over Ns/Conrail?
The structure is 281 ft (85.7 m) long with a longest span of 105 ft (32 m) and a deck 44 ft wide.
Who owns SR 2 over Over Ns/Conrail?
It is owned by the State Highway Agency.