US Bridges

SR 2 over Over PER-120-0100 Columb

Good

Erie County, Ohio · 2.83 MI E of SR 4 · Structure no. 2200872

Built
1962
63 years old, rebuilt 2000
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
197 ft
3 main spans
Daily traffic
12,357
2015 count
Owner
State
State Highway Agency

About this bridge

SR 2 over Over PER-120-0100 Columb is a steel continuous stringer/multi-beam or girder carrying SR 2 over Over PER-120-0100 Columb in Erie County, Ohio. It was built in 1962 and reconstructed in 2000, so it is 63 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,357 vehicles a day, roughly 14% of them trucks, projected to reach 17,152 by 2035. The structure is 197 ft (60 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR 2
CrossesOver PER-120-0100 Columb
Location2.83 MI E of SR 4
RouteState Highway 2
StateOhio
Coordinates41.39736, -82.67586
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.8 US tons
Inventory rating48.6 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length197 ft (60 m)
Longest span80 ft (24.4 m)
Deck width44 ft (13.3 m)
Roadway width41 ft (12.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,357 (2015)
Projected traffic17,152 by 2035
Trucks14%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 2 over Over PER-120-0100 Columb built?

It was built in 1962, making it 63 years old in 2025. It was reconstructed in 2000.

What condition is SR 2 over Over PER-120-0100 Columb in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does SR 2 over Over PER-120-0100 Columb carry?

About 12,357 vehicles per day (2015 count), of which roughly 14% are trucks.

How long is SR 2 over Over PER-120-0100 Columb?

The structure is 197 ft (60 m) long with a longest span of 80 ft (24.4 m) and a deck 44 ft wide.

Who owns SR 2 over Over PER-120-0100 Columb?

It is owned by the State Highway Agency.