US Bridges

Olive Green Rd. over Sugar Creek

Good

Delaware County, Ohio · Int. of Porter Central RD · Structure no. 2136511

Built
2011
14 years old
Condition
Good
inspected January 2024
Type
Frame
Concrete
Length
32 ft
1 main span
Daily traffic
1,780
2018 count
Owner
County
County Highway Agency

About this bridge

Olive Green Rd. over Sugar Creek is a concrete frame carrying Olive Green Rd. over Sugar Creek in Delaware County, Ohio. It was built in 2011, so it is 14 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,780 vehicles a day, roughly 5% of them trucks, projected to reach 2,471 by 2038. The structure is 32 ft (9.8 m) long and 120 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesOlive Green Rd.
CrossesSugar Creek
LocationInt. of Porter Central RD
RouteCounty Highway C0052
StateOhio
Coordinates40.31802, -82.79542
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.2 US tons
Inventory rating41.8 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length32 ft (9.8 m)
Longest span29 ft (8.8 m)
Deck width120 ft (36.6 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,780 (2018)
Projected traffic2,471 by 2038
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Olive Green Rd. over Sugar Creek built?

It was built in 2011, making it 14 years old in 2025.

What condition is Olive Green Rd. over Sugar Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Olive Green Rd. over Sugar Creek carry?

About 1,780 vehicles per day (2018 count), of which roughly 5% are trucks.

How long is Olive Green Rd. over Sugar Creek?

The structure is 32 ft (9.8 m) long with a longest span of 29 ft (8.8 m) and a deck 120 ft wide.

Who owns Olive Green Rd. over Sugar Creek?

It is owned by the County Highway Agency.