IR-71 NB over Over Bale-Kenyon RD TR10
GoodDelaware County, Ohio · 2.50 MI N of Ir 270 · Structure no. 2102056
- Built
- 2001
- 24 years old
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 147 ft
- 3 main spans
- Daily traffic
- 41,597
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
IR-71 NB over Over Bale-Kenyon RD TR10 is a steel continuous stringer/multi-beam or girder carrying IR-71 NB over Over Bale-Kenyon RD TR10 in Delaware County, Ohio. It was built in 2001, so it is 24 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 41,597 vehicles a day, roughly 17% of them trucks, projected to reach 57,737 by 2035. The structure is 147 ft (44.7 m) long and 67 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IR-71 NB over Over Bale-Kenyon RD TR10 built?
It was built in 2001, making it 24 years old in 2025.
What condition is IR-71 NB over Over Bale-Kenyon RD TR10 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does IR-71 NB over Over Bale-Kenyon RD TR10 carry?
About 41,597 vehicles per day (2015 count), of which roughly 17% are trucks.
How long is IR-71 NB over Over Bale-Kenyon RD TR10?
The structure is 147 ft (44.7 m) long with a longest span of 60 ft (18.3 m) and a deck 67 ft wide.
Who owns IR-71 NB over Over Bale-Kenyon RD TR10?
It is owned by the State Highway Agency.