US Bridges

Day RD over Simon Joint Ditch

Good

Darke County, Ohio · .72 MI E Reed · Structure no. 1959662

Built
1985
40 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
45 ft
1 main span
Daily traffic
351
2015 count
Owner
County
County Highway Agency

About this bridge

Day RD over Simon Joint Ditch is a steel stringer/multi-beam or girder carrying Day RD over Simon Joint Ditch in Darke County, Ohio. It was built in 1985, so it is 40 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 351 vehicles a day, roughly 7% of them trucks, projected to reach 487 by 2035. The structure is 45 ft (13.7 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesDay RD
CrossesSimon Joint Ditch
Location.72 MI E Reed
RouteCounty Highway T0177
StateOhio
Coordinates40.2772, -84.46965
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating50 US tons
Inventory rating30 US tons

Structure

MaterialSteel
DeckWood or timber
Main spans1
Design loadHS 20
Structure length45 ft (13.7 m)
Longest span45 ft (13.7 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic351 (2015)
Projected traffic487 by 2035
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Day RD over Simon Joint Ditch built?

It was built in 1985, making it 40 years old in 2025.

What condition is Day RD over Simon Joint Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Day RD over Simon Joint Ditch carry?

About 351 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is Day RD over Simon Joint Ditch?

The structure is 45 ft (13.7 m) long with a longest span of 45 ft (13.7 m) and a deck 24 ft wide.

Who owns Day RD over Simon Joint Ditch?

It is owned by the County Highway Agency.