Greenward Way S over Root Ditch
FairCuyahoga County, Ohio · 590 Ft S. of Golf View LA · Structure no. 1878603
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected June 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 56 ft
- 1 main span
- Daily traffic
- 100
- 1996 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Greenward Way S over Root Ditch is a prestressed concrete box beam or girders - multiple carrying Greenward Way S over Root Ditch in Cuyahoga County, Ohio. It was built in 1995, so it is 30 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, roughly 5% of them trucks, projected to reach 139 by 2016. The structure is 56 ft (17.1 m) long and 29 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Greenward Way S over Root Ditch built?
It was built in 1995, making it 30 years old in 2025.
What condition is Greenward Way S over Root Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does Greenward Way S over Root Ditch carry?
About 100 vehicles per day (1996 count), of which roughly 5% are trucks.
How long is Greenward Way S over Root Ditch?
The structure is 56 ft (17.1 m) long with a longest span of 52 ft (15.9 m) and a deck 29 ft wide.
Who owns Greenward Way S over Root Ditch?
It is owned by the City or Municipal Highway Agency.