US Bridges

East 75th Street over NS & Gcrta

Good

Cuyahoga County, Ohio · S. of Woodland at E75th · Structure no. 1867181

Built
2023
2 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
231 ft
2 main spans
Daily traffic
2,435
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

East 75th Street over NS & Gcrta is a steel continuous stringer/multi-beam or girder carrying East 75th Street over NS & Gcrta in Cuyahoga County, Ohio. It was built in 2023, so it is 2 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,435 vehicles a day, roughly 3% of them trucks, projected to reach 2,680 by 2040. The structure is 231 ft (70.5 m) long and 40 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesEast 75th Street
CrossesNS & Gcrta
LocationS. of Woodland at E75th
RouteCity Street E75ST
StateOhio
Coordinates41.48547, -81.63643
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment6: Equal to present minimum criteria
Operating rating61.8 US tons
Inventory rating47.8 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length231 ft (70.5 m)
Longest span116 ft (35.4 m)
Deck width40 ft (12.3 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,435 (2020)
Projected traffic2,680 by 2040
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was East 75th Street over NS & Gcrta built?

It was built in 2023, making it 2 years old in 2025.

What condition is East 75th Street over NS & Gcrta in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does East 75th Street over NS & Gcrta carry?

About 2,435 vehicles per day (2020 count), of which roughly 3% are trucks.

How long is East 75th Street over NS & Gcrta?

The structure is 231 ft (70.5 m) long with a longest span of 116 ft (35.4 m) and a deck 40 ft wide.

Who owns East 75th Street over NS & Gcrta?

It is owned by the City or Municipal Highway Agency.