US Bridges

Lander Road CR 20 over Creek to Chagrin River

Fair

Cuyahoga County, Ohio · 1600 N of Shaker Blvd · Structure no. 1834983

Built
1998
27 years old
Condition
Fair
inspected April 2024
Type
Frame
Concrete
Length
30 ft
1 main span
Daily traffic
10,650
2015 count
Owner
County
County Highway Agency

About this bridge

Lander Road CR 20 over Creek to Chagrin River is a concrete frame carrying Lander Road CR 20 over Creek to Chagrin River in Cuyahoga County, Ohio. It was built in 1998, so it is 27 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 10,650 vehicles a day, roughly 5% of them trucks, projected to reach 14,782 by 2035. The structure is 30 ft (9.1 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesLander Road CR 20
CrossesCreek to Chagrin River
Location1600 N of Shaker Blvd
RouteCounty Highway C0020
StateOhio
Coordinates41.48274, -81.46325
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations on dry land well above flood water elevations
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating91.1 US tons
Inventory rating70 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length30 ft (9.1 m)
Longest span28 ft (8.5 m)
Deck width30 ft (9.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,650 (2015)
Projected traffic14,782 by 2035
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lander Road CR 20 over Creek to Chagrin River built?

It was built in 1998, making it 27 years old in 2025.

What condition is Lander Road CR 20 over Creek to Chagrin River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Lander Road CR 20 over Creek to Chagrin River carry?

About 10,650 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is Lander Road CR 20 over Creek to Chagrin River?

The structure is 30 ft (9.1 m) long with a longest span of 28 ft (8.5 m) and a deck 30 ft wide.

Who owns Lander Road CR 20 over Creek to Chagrin River?

It is owned by the County Highway Agency.