US Bridges

Mastick RD CR 101 over Metroparks Hillside

Good

Cuyahoga County, Ohio · 2980 N of Eaton Road · Structure no. 1831240

Built
1975
50 years old, rebuilt 2020
Condition
Good
inspected April 2023
Type
Slab
Concrete Continuous
Length
384 ft
13 main spans
Daily traffic
8,040
2019 count
Owner
County
County Highway Agency

About this bridge

Mastick RD CR 101 over Metroparks Hillside is a concrete continuous slab carrying Mastick RD CR 101 over Metroparks Hillside in Cuyahoga County, Ohio. It was built in 1975 and reconstructed in 2020, so it is 50 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,040 vehicles a day, roughly 4% of them trucks, projected to reach 8,360 by 2039. The structure is 384 ft (116.9 m) long and 44 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesMastick RD CR 101
CrossesMetroparks Hillside
Location2980 N of Eaton Road
RouteCity Street 14609
StateOhio
Coordinates41.43565, -81.84612
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating58.2 US tons
Inventory rating45 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans13
Design loadHS 20 + Mod
Structure length384 ft (116.9 m)
Longest span30 ft (9.2 m)
Deck width44 ft (13.5 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,040 (2019)
Projected traffic8,360 by 2039
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesOther
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Mastick RD CR 101 over Metroparks Hillside built?

It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2020.

What condition is Mastick RD CR 101 over Metroparks Hillside in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Mastick RD CR 101 over Metroparks Hillside carry?

About 8,040 vehicles per day (2019 count), of which roughly 4% are trucks.

How long is Mastick RD CR 101 over Metroparks Hillside?

The structure is 384 ft (116.9 m) long with a longest span of 30 ft (9.2 m) and a deck 44 ft wide.

Who owns Mastick RD CR 101 over Metroparks Hillside?

It is owned by the County Highway Agency.