Bishop Road CR 38 over Branch Euclid Creek
GoodCuyahoga County, Ohio · .4MI S of County Line · Structure no. 1830414
- Built
- 1987
- 38 years old, rebuilt 2021
- Condition
- Good
- inspected June 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 37 ft
- 1 main span
- Daily traffic
- 9,170
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Bishop Road CR 38 over Branch Euclid Creek is a prestressed concrete box beam or girders - multiple carrying Bishop Road CR 38 over Branch Euclid Creek in Cuyahoga County, Ohio. It was built in 1987 and reconstructed in 2021, so it is 38 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,170 vehicles a day, roughly 7% of them trucks, projected to reach 12,728 by 2035. The structure is 37 ft (11.2 m) long and 40 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bishop Road CR 38 over Branch Euclid Creek built?
It was built in 1987, making it 38 years old in 2025. It was reconstructed in 2021.
What condition is Bishop Road CR 38 over Branch Euclid Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does Bishop Road CR 38 over Branch Euclid Creek carry?
About 9,170 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is Bishop Road CR 38 over Branch Euclid Creek?
The structure is 37 ft (11.2 m) long with a longest span of 36 ft (10.9 m) and a deck 40 ft wide.
Who owns Bishop Road CR 38 over Branch Euclid Creek?
It is owned by the County Highway Agency.